Change review

Specification Revision Comparison Record

Enter the previously approved and the proposed value for each field under review. The worksheet marks each line as unchanged text or changed, lists every change with its named reviewer and flags lines with a missing value. It doesn’t approve a substitution.

Enter records → review differences or arithmetic → resolve missing evidence. No order or approval is generated.

Enter your records

Every field is required for a complete record. Enter 0 only when zero is deliberate; missing values remain unresolved. Use non-confidential references only.

Record fields

  • Field, with document and revision references
  • Previously approved value
  • Proposed value
  • Reviewer responsible

Reviewable result

Enter records to begin.

Worksheet processing stays in this page. Inputs are not uploaded or stored, and reloading clears them. Page analytics are disabled here. Contact links and the quote form are separate actions; review the result before choosing to share it.

Worked example

A project buyer reviews a proposed vanity top change after approval, listing the material and the dependent dimension and cutout lines.

Example figures are invented for illustration. They are not product data, prices or a quotation.

Example inputs

Field, with document and revision referencesPreviously approved valueProposed valueReviewer responsible
Vanity top material, drawing V-10 rev BEngineered quartz, matte whiteSintered stone, matte whiteProject engineer
Finished top thickness, drawing V-10 rev B20 mm20 mmProject engineer
Faucet hole cutout, drawing V-10 rev BOne hole, 35 mm diameter, centeredOne hole, 35 mm diameter, centeredSite installer

Result from the worksheet

Specification Revision Comparison Record

LOCAL WORKSHEET — review before using

Line 1 · Vanity top material, drawing V-10 rev B: CHANGED — review required
  Old: Engineered quartz, matte white
  Proposed: Sintered stone, matte white
  Reviewer: Project engineer

Line 2 · Finished top thickness, drawing V-10 rev B: UNCHANGED TEXT
  Old: 20 mm
  Proposed: 20 mm
  Reviewer: Project engineer

Line 3 · Faucet hole cutout, drawing V-10 rev B: UNCHANGED TEXT
  Old: One hole, 35 mm diameter, centered
  Proposed: One hole, 35 mm diameter, centered
  Reviewer: Site installer

REVIEW ITEMS

Line 1: changed specification requires Project engineer review.

No product, order, installation or commercial approval is generated.

How to read it

Each line compares the old and proposed text exactly. Line 1 changes from Engineered quartz to Sintered stone, so it is marked CHANGED and listed as a review item for the Project engineer. Lines 2 and 3 read the same, but UNCHANGED TEXT is not proof the product is unchanged, and a new material may still need its own dimension check.

Compare against a baseline you can find

Put the document numbers and revisions in the field description or the values. “Same as before” isn’t a baseline unless the approval it refers to can be located. Material, finished thickness, cutouts, supports and connections to other components are common fields, but the right list depends on the actual change.

List the knock-on effects too

A new material can call for a separate check of dimensions or fixing. Add those dependent fields as their own lines instead of reading an unchanged color as proof of equivalence. A text difference marks something to review; identical wording doesn’t prove the physical product is unchanged.

Naming a reviewer doesn’t release the change

The reviewer field records who is responsible, nothing more. No signature, acceptance status or commercial instruction is created. If the old or the proposed value is missing, the line is marked incomplete rather than unchanged. Keep the final approval in the project’s controlled records.

Change review questions

Does a matching value approve the revised product?

No. This is a text comparison, not a technical approval.

How should document versions be recorded?

Give the old and proposed document and revision references with the relevant field.

What if the previously approved value is unknown?

Leave it blank and find the baseline; the tool won’t guess it, and the line stays incomplete.

Should dependent details get their own lines?

Yes. Add affected dimensions, supports or connections as separate fields.

Is the reviewer name an electronic signature?

No. It only records who is responsible for the review.

Discuss the reviewed requirement

Use the result to identify questions for WNS Global. Offered products, specifications and commercial conditions still require separate confirmation.

Contact details and inquiry page

START WITH THE PRODUCT DETAILS

Tell Us What You Need

Share the bathroom products, project requirements, target market, dimensions, materials, finishes, quantities, or customization details currently available. WNS Global will review the request and identify the information needed for the next step.