Drawing-based sourcing · Foshan, China

Project & Custom Bathroom Vanity Manufacturer

Room types aligned through one approval process

WNS Global supports drawing-based bathroom vanity sourcing for hotels, apartments, villas, retail developments and multi-unit projects. Approved dimensions, basin layout, plumbing alignment, storage, finish references, packaging and technical revisions are coordinated before production. Cabinets in this range are produced at our own base in Foshan, so drawings are approved with the people who will build them rather than through an intermediary.

The sourcing benefit is traceability: connect each room type to its approved drawing, configuration, label and packing requirement.

WhatsApp

Configuration range

Project Vanity Types

Choose by room type, mounting, basin count and installation plan. Final dimensions, construction, finishes and components require approved project documents.

Specification control

Product Specifications

Use the approved drawing, room schedule and finish reference as the common purchasing, production and installation record.

An open vanity drawer with divided compartments
Project typeConfirm by approved project briefCabinet constructionConfirm by approved product drawing
Mounting typeConfirm by approved product drawingWidth, depth and heightConfirm by approved product drawing
Basin configurationConfirm by approved product drawingCountertop optionConfirm by approved product drawing
Basin positionConfirm by approved product drawingPlumbing cut-outConfirm with MEP information
Storage layoutConfirm by approved product drawingMirror coordinationConfirm by approved room elevation
Finish referenceConfirm against approved sampleHardwareConfirm by approved component list
PackagingConfirm by approved orderRoom identificationConfirm project coding requirement
Drawing and sample statusRecord approved revisionTarget marketConfirm project requirements
Project bathroom vanity fitted against a finished wall

Buyer decisions

Common Sourcing Questions

Start with room information, then approve the coordinated vanity.

What Starts a Quote?

Send plans, elevations, BOQ, room schedule, quantities, destination and market requirements.

Can Sizes Follow Room Types?

Yes. Separate standard and special sizes with clear quantities and revision control.

Single or Double Basin?

Choose from room width, user plan, plumbing, countertop and storage needs.

What Plumbing Is Needed?

Show supply, waste, trap, wall or floor route and access zones.

Can Components Be Coordinated?

Review cabinet, countertop, basin, mirror cabinet and storage as one room package.

How Is Finish Approved?

Use a named reference or sample with written criteria and revision status.

How Is Production Approved?

Record sample or reference acceptance before releasing the approved batch specification.

Can Packing Identify Rooms?

Confirm codes, carton marks, component grouping and room schedule relationship.

Risk control

Sourcing Risk Support

WNS Global coordinates drawings, references and component questions. Buyer approval and accurate project information remain necessary.

Cabinet surfaces finished by hand during manufacture
RiskWNS Global sourcing response
Dimension mismatchConnect room type and quantity to an approved drawing.
MEP or plumbing conflictRequest service positions and cut-out confirmation.
Incomplete room scheduleIdentify missing types, quantities and revisions before approval.
Wrong basin cut-outApprove basin, countertop and cut-out relationship together.
Inconsistent finishUse one named reference and agreed review criteria.
Unsuitable storageCheck drawers, doors, plumbing and daily access on drawings.
Component mismatchReview basin, hardware, mirror and cabinet component list.
Packing damageAgree cabinet, countertop, basin and edge protection.
Unapproved changeApply revision control before production release.
Vanity cabinet interior shown as a fit-out reference

Private-label and projects

OEM / ODM Services

Technical review is required before quotation. Options depend on the approved project specification.

  • Custom width, depth and height
  • Cabinet divisions and storage layout
  • Single or double basin configuration
  • Countertop and basin coordination
  • Approved finish reference
  • Hardware and mirror-cabinet direction
  • Private-label packaging and marks
  • Project documents and sample approval

Specifications, compliance, quantities and terms require written confirmation.

Project sequence

Customisation Process

Seven actions align room types, components and batch approval.

WNS Global manufacturing base in Foshan, China
  1. 01
    Send Drawings and Schedules

    Share BOQ, room types, quantities, elevations and destination.

  2. 02
    Confirm Dimensions and Plumbing

    Record cabinet size, services, cut-outs and installation conditions.

  3. 03
    Select the Configuration

    Define cabinet, basin, countertop, storage and finish.

  4. 04
    Review the Technical Drawing

    Check dimensions, components, openings and room identification.

  5. 05
    Approve Sample or Reference

    Record accepted appearance, components and revision status.

  6. 06
    Confirm Batch Production

    Release approved drawings and written specifications.

  7. 07
    Inspect, Pack and Coordinate

    Review labels, protection, marks and shipment documents.

Pre-shipment review

Quality Control

Inspection compares the project vanity with the approved drawing, reference and order.

  • Approved width, depth and height
  • Finish reference and cabinet appearance
  • Basin and countertop fit
  • Plumbing and hardware cut-outs
  • Door and drawer operation
  • Hardware and mirror components where included
  • Room identification labels where required
  • Cabinet, countertop and basin packing

Inspection scope follows the purchase order or approved quality standard. Site installation remains project-specific.

A project vanity with open drawers and integrated basins
Project vanity shown as a repeatable bathroom specification

Product definition

What Are Project and Custom Vanities?

Project and custom bathroom vanities are specified against drawings, room types, installation conditions and an approval process instead of only a fixed retail size.

They may coordinate cabinet dimensions, basin, countertop, plumbing, storage, mirror and packaging. Each element remains subject to approved project documents.

Custom does not remove the need for technical confirmation, site measurement, local review or installation planning.

Comparison of wall-mounted, floor-standing and double-sink project vanities

Decision guide

Bathroom Vanity Comparison

Choose by drawing fit, component scope, batch control and installation planning.

OptionDrawing fit and customisationBasin and installation planningBatch, packing and verification
Project and custom vanitiesSpecified by approved room types and drawingsBasin, services and installation coordinated per projectRevision, labels and packing require project control
Standard-size vanitiesSelected from defined dimensions and configurationsSite must accommodate the available productVerify model, components and standard packing
Bathroom vanity setsCoordinated cabinet, basin and related packageSet relationships need room and service reviewVerify included components, finish and grouped packing
Cabinet-only optionsCabinet scope may simplify or separate sourcingBasin, countertop and cut-outs require external coordinationVerify interface responsibility and package scope

RFQ checklist

Sourcing Selection Checklist

Copy these points into the quotation request and identify the technical approver.

  1. Project countryState location and target-market requirements.
  2. DrawingsAttach plans, elevations and vanity details.
  3. Room scheduleList quantity by room type.
  4. DimensionsProvide width, depth, height and site limits.
  5. Wall and plumbingShow support, supply, waste and access.
  6. Basin and countertopDefine configuration and cut-outs.
  7. Finish and storageAttach references and cabinet layout.
  8. Mirror requirementState mirror or mirror-cabinet coordination.
  9. PackagingDefine room codes and component grouping.
  10. DestinationProvide delivery location and handling scope.
  11. Approval timelineIdentify drawing, sample and revision decisions.
Project vanity configuration compared against the bathroom wall
Project vanity reviewed against the approved project reference

Factory-backed coordination As a Foshan sanitary ware supplier we can also bring in the taps, mirrors and accessories that complete a vanity package, so one contact covers the whole room.

Work With WNS Global

WNS Global provides factory-backed sourcing communication from Foshan, China.

Developers, contractors, distributors and private-label buyers can send BOQs, drawings, room schedules, finish references, quantities, technical needs and target-market requirements for review.

Specifications and commercial terms require written project confirmation.

About WNS Global
Round mirror and shelf detail of a project bathroom vanity

Buyer questions

Project Bathroom Vanity FAQ

Project-specific answers remain subject to approved drawing and project confirmation.

Yes, subject to technical and commercial review. Send bathroom elevations, plans, vanity details, BOQs, room schedules, quantities and target-market requirements.

Yes. Separate each room type, quantity and dimension, then identify standard and special units for drawing, labeling and packing review.

Mark basin centerlines, countertop relationships, tap direction, cut-outs and cabinet divisions on the approved drawing before production release.

Provide supply and waste positions, wall or floor routes, traps, access needs and any site constraints. Final plumbing remains project-specific.

Sample or reference approval may be included subject to technical and commercial confirmation. Record approved dimensions, appearance, components and revision status.

Use an approved finish reference, identify acceptable review criteria and compare production checks with the purchase order or agreed quality standard.

Room, type or project labels can be reviewed. Confirm the coding structure, carton marks, component grouping and packing instruction in writing.

Yes, subject to confirmation. Share branding, packaging, documentation, quantities, drawings, destination, technical needs and approval responsibilities.

Learn before you buy

Buying Guides

Bathroom space prepared for project vanity specification

Project enquiry Whether the requirement is a bathroom vanity wholesale program or a single project schedule, the same team handles it.

Request Project & Custom Bathroom Vanity Details

Send drawings, room schedule, dimensions, plumbing, basin and countertop needs, finish reference, quantities, destination and target-market requirements.

START WITH THE PRODUCT DETAILS

Tell Us What You Need

Share the bathroom products, project requirements, target market, dimensions, materials, finishes, quantities, or customization details currently available. WNS Global will review the request and identify the information needed for the next step.