Which Configuration Fits?
Select a single, double, custom-length, wall-to-wall or project top according to cabinet run, bowl layout, support and plumbing plan.

Factory-backed sourcing · Foshan, China
Integrated basin and vanity tops for importers, distributors, developers, hospitality teams, contractors, showroom buyers and project specifiers. Confirm overall length, depth and height, bowl count and position, drain centers, tap interface, end detail, cabinet support, wall condition, overflow status where confirmed and finish reference against an approved drawing, sample, technical sheet or confirmed model.
Integrated Basins & Vanity Tops are coordinated wash surfaces for cabinet runs and bathroom projects. WNS Global supports practical B2B requirements review, document alignment and export communication from Foshan, China. Final values remain subject to approved specification. This line is produced at our own base in Foshan, so a buyer deals with the sanitary ware manufacturer directly rather than through an intermediary.
Configuration range
Select bowl count, length, wall condition and cabinet support first, then confirm drain centers, tap interface, end detail and surface reference.

An integrated top for a one-user cabinet and coordinated faucet position.
Explore Bathroom Vanities →
A shared vanity-top solution planned around bowl and drain spacing.
Explore Bathroom Vanities →
A drawing-led top for controlled cabinet runs and wall conditions.
Explore Bathroom Vanities →
A continuous top planned around wall measurement and installation support.
Explore Bathroom Vanities →
Repeatable top-and-basin packages for room-type specifications.
Explore Bathroom Vanities →Specification control
Final values should be controlled by a project drawing, approved sample, technical sheet or confirmed model. Where a value is not agreed, record it as “Available / confirm per model.”
What buyers should confirm: overall length, depth and height; bowl count and position; drain centers; tap interface; end detail; cabinet support; wall condition; overflow status if confirmed; surface or finish reference; and documents to confirm.

| Overall length, depth and height | Available / confirm per model | Bowl count and position | Confirm against approved drawing |
|---|---|---|---|
| Drain centers | Confirm per selected configuration | Tap interface and end detail | Confirm with plumbing plan |
| Cabinet support and wall condition | Confirm with responsible trade | Overflow status if confirmed | Confirm per selected configuration |
| Surface or finish reference | Confirm with approved reference | Project documents to confirm | Drawing, sample, technical sheet and quotation |
| Packing and labels | Confirm order-specific protection, labels and document needs before order approval | ||

Buyer decisions
Review the complete basin-and-cabinet package, not just the visible surface.
Select a single, double, custom-length, wall-to-wall or project top according to cabinet run, bowl layout, support and plumbing plan.
Provide finished length, depth, height, cabinet support, wall condition, drain and water centerlines, tap reference, end detail and installation responsibility.
Confirm surface reference, bowl layout, drain and tap interface, end detail, overflow status and supplied component scope.
Show dimensions, bowl position, drain centers, tap interface, end details, cabinet support, wall condition, surface reference and responsible approver.
The buyer or project team should verify destination-market requirements for structure, water connection, drainage and installation.
Risk control
WNS Global can support requirements, drawing or sample review, packing alignment and issue escalation. The buyer remains responsible for local structure, services, installation suitability and site access.

| Risk to control | Pre-order sourcing response |
|---|---|
| Drain, water and tap positions | Confirm drain, water and tap positions plus finished height before drawing approval. |
| Tap reach and bowl spacing | Review tap reach, bowl spacing and drawer clearance with the responsible trade. |
| Cabinet flatness, support and wall condition | Confirm cabinet flatness, support and wall condition before approval. |
| Site dimensions and end details | Confirm site dimensions and end detail with the project team. |
| Approved drawing revision | Lock the approved drawing revision before order confirmation. |
| Transport handling and installation sequence | Align protective packing, handling and installation sequence. |

Private-label and projects
WNS Global can review length, depth, bowl layout, drain and tap positions, end treatment, surface direction and packaging, subject to technical and commercial feasibility, an approved reference and order confirmation.
Room drawings, dimensions, bowl layout, drain and tap positions, end details, cabinet support, wall condition, finish reference, quantity, target market and packing request.
Feasibility, configuration fit, reference clarity and order-document alignment.
Project sequence
Use one approved record for dimensions, bowl layout, drain and tap positions, end detail, surface reference and order scope.

Share room drawings, length, depth, height, bowl layout, drain and tap positions, end detail, cabinet support, finish reference and quantity.
Review dimensions, bowl layout, drain and tap positions, end detail, cabinet support, plumbing and surface reference.
Approve the applicable drawing, technical sheet, sample, finish reference or component schedule.
Confirm approved order details, packing and the agreed inspection scope.
Align labels, packing list, agreed documents and shipment coordination.
Order-specific inspection
Inspection scope and acceptance criteria are agreed for the order. The final review compares the selected product with the approved specification, finish reference and packing requirement.
Any special test, certificate or local standard remains subject to the selected product and destination-project requirement.

Project fit
Choose the application only after cabinet run, bowl layout, plumbing points, wall condition and support are defined.

Coordinate long tops with room-type cabinet and plumbing schedules.
Discuss project requirements →
Plan shared bowls and taps around the approved user layout.
Discuss project requirements →
Use a coordinated wash surface where service points are controlled.
Discuss commercial requirements →
Replace or specify a top after confirming cabinet and wall dimensions.
Discuss retail requirements →
Product definition
Integrated Basins & Vanity Tops combine a basin and top as one coordinated wash surface for a cabinet run or supporting vanity structure. They can use one bowl or two bowls, a standard or custom length, and an open end or wall-to-wall detail. The product is selected to coordinate with cabinet support, wall condition, drain centers, tap interface, plumbing route, finished dimensions, surface reference and installation sequence. A drawing, approved sample, technical sheet or confirmed model should define final scope. Do not assume a tap, waste, trap, mirror, cabinet, wall preparation, installation or visible accessory is included unless the written quotation names it.
A styled image does not define supply scope. Confirm taps, wastes, traps, mirrors, plumbing components, installation and visible accessories in the written quotation.
Not the same as

Decision guide
Compare single-bowl, double-bowl and custom-length routes by integration, planning variables and drawing verification.
| Approach | Installation or integration | Typical project fit | Buyer confirmation point |
|---|---|---|---|
| Single-bowl vanity top | One-bowl top coordinated with cabinet, drain centers and tap interface. | Hotel Vanity Runs, guest bathrooms and compact room types. | Length, depth, height, bowl position, drain centers and tap interface. |
| Double-bowl vanity top | Two-bowl top coordinated with bowl spacing, shared drainage and tap positions. | Shared residential bathrooms, hotel suites and wider cabinet runs. | Bowl spacing, cabinet support, drain positions and tap layout. |
| Custom-length or wall-to-wall top | Length and end details coordinated with cabinet run, wall condition and installation support. | Commercial restrooms, renovation work and controlled project runs. | End detail, wall condition, cabinet support, surface reference and supplied scope. |
RFQ checklist
Attach these points to the enquiry before quotation or purchase-order approval.


Factory-backed coordination As a Foshan sanitary ware supplier we can also bring in the fittings that sit around it, so one contact covers the whole bathroom.
WNS Global is a factory-backed bathroom supplier and export team from Foshan, China. For integrated basin & vanity top projects, the role is to coordinate a clear buying brief, selected configuration, export communication and project-document alignment against the approved reference.
Share room drawings, dimensions, bowl layout, drain and tap positions, end detail, cabinet support, finish reference, quantity and target market.
Review dimensions, bowl layout, end detail, cabinet support, drain and tap interface, finish reference and supplied scope.
Keep product, packing, labels, documents and approval ownership aligned.
Coordinate agreed inspection, packing and shipment-document questions.
Exact product availability, materials, finishes, commercial terms and delivery details remain subject to written confirmation for the selected order.
About WNS Global
Buyer questions
Model-dependent points should be confirmed through the selected product reference and approved project documents.
Start with overall length, depth and height, bowl layout, drain centers, tap interface, end detail, cabinet support and surface reference. Confirm the Integrated Basins & Vanity Tops configuration on the approved drawing.
Share room drawings, dimensions, bowl layout, drain and tap positions, end detail, cabinet support, finish reference, quantity and the latest revision.
Do not assume they are included. Confirm the exact supplied component scope and the responsible installation party in the approved quotation.
WNS Global can review length, depth, bowl layout, drain and tap positions, end treatment, surface direction, packaging and drawing approval subject to feasibility, an approved reference and order confirmation.
Inspection follows the agreed order scope, including dimensions, bowl, drain and tap-interface positions, surface and edge condition, approved revision, components, labels, packing and the technical reference.
The buyer or responsible project team should verify destination-project requirements for structure, water connection, drainage and installation.
Learn before you buy
One piece, no joint, and the reason projects keep specifying it.
Six decisions, and everything is fixed at fabrication.
Hardness and repairability pull in opposite directions. Pick one.
Where the bowl meets the top decides cleaning, height and cost.
Follow the process from drawings and materials through assembly, finishing, inspection, and packing.

Project enquiry Sanitary ware wholesale orders and single project schedules are handled by the same team.
Use Your Request to share your quantity estimate, drawing, reference photo, required finish, target market or required date where relevant. WhatsApp is the faster contact route for a first discussion.