What Is a Quadrant?
It occupies a corner and uses a curved or faceted front to reduce room projection.

Compact-bathroom sourcing · Foshan, China
Corner geometry confirmed before production
Corner shower enclosures use two bathroom walls to define the shower area. A quadrant enclosure adds a curved or faceted front for a compact footprint. Offset proportions, shower base, radius and door arrangement must follow approved drawings. This line is produced at our own base in Foshan, so a buyer deals with the sanitary ware manufacturer directly rather than through an intermediary.
Configuration range
Select the footprint first. Then confirm both finished wall dimensions, curve reference, entry, shower base relationship and door operation on the approved drawing.

Equal-sided corner footprints use a curved or faceted front, subject to confirmed wall lengths, radius reference, shower base geometry and entry arrangement.
Discuss this configuration →
Unequal wall lengths extend one side of the footprint and require clear handing, shower base reference, door position and approved left-right orientation.
Discuss this configuration →
Central corner access can support compact plans when panel meeting, usable entry, seals, wall adjustment and nearby fixture clearance are coordinated.
Discuss this configuration →
Sliding panels avoid outward swing while roller access, panel overlap, curved-track geometry, entry width and cleaning requirements remain project decisions.
Discuss this configuration →
Hinged entries provide direct movement where swing clearance, wall support, fixed panels, seals, threshold conditions and handing are confirmed.
Discuss this configuration →
Drawing-based layouts coordinate non-standard walls, asymmetrical footprints, panel geometry, operation, finish, installation conditions, labels and export project packing.
Send project brief →Specification control
Record each item on the approved product drawing. Unverified values require project confirmation.
Use a consistent viewing direction when stating handing and wall lengths.

| Enclosure shape | Confirm by approved product drawing | Left wall dimension | Confirm by approved product drawing |
|---|---|---|---|
| Right wall dimension | Confirm by approved product drawing | Radius / curved front | Confirm by shower base or approved drawing |
| Overall height | Confirm by approved product drawing | Door type | Confirm by approved product drawing |
| Entry width | Confirm by approved product drawing | Glass specification | Confirm by approved product drawing |
| Frame finish | Confirm against approved reference | Shower base compatibility | Confirm before purchase |
| Handedness | Confirm from agreed viewing direction | Wall adjustment | Confirm by selected profile system |
| Packaging | Confirm by approved order and packing requirement | ||

Buyer decisions
Resolve footprint, shower base and door movement before quotation approval.
It occupies a corner and uses a curved or faceted front to reduce room projection.
One wall side is longer, so handing and both wall dimensions become essential.
Record both finished walls and identify the curve from the shower base or drawing.
Match footprint, radius, rim, threshold and mounting position; shapes are not universally interchangeable.
Compare entry, swing, panel overlap, cleaning access, wall support and nearby fixtures.
Record windows, controls, toilets, vanities, towel rails, pipes and uneven walls.
Risk control
WNS Global organizes measurement, drawing and component checks before production. Installation responsibility and local compliance remain project-specific.

| Risk | WNS Global sourcing response |
|---|---|
| Incorrect radius | Request the shower base drawing or an agreed curved-front reference before approval. |
| Unequal walls omitted | Record both finished wall lengths and identify the longer side. |
| Shower base mismatch | Compare footprint, rim, threshold and mounting position with the enclosure drawing. |
| Door conflict | Mark full door travel and nearby fixtures on the room plan. |
| Out-of-square corner | Request several finished measurements and site photographs for review. |
| Incorrect handing | Approve left-right orientation from a stated viewing direction. |
| Profile-finish mismatch | Approve a finish reference with the component list. |
| Glass damage | Agree edge protection, package labels, handling and unloading responsibilities. |

Private-label and projects
Configurable directions depend on the chosen enclosure system, technical review and approved sample or project standard.
Project sequence
Seven steps align the bathroom corner, shower base, enclosure geometry and shipment scope.

Share plans, photographs, quantities and project references.
Measure after final tiles at several positions.
Provide the shower base drawing, rim and threshold details.
Mark entry, handing, swing or sliding travel.
Check geometry, panels, profiles, hardware and seals.
Confirm finish, labels, documents and packaging.
Inspect, pack and align documentation and handling scope.
Pre-shipment review
Inspection compares the order with the approved drawing, component list and agreed quality reference.
Inspection scope should be written into the purchase order or approved quality standard.

Project fit
Corner footprints support space planning where both walls, entry and installation conditions can be confirmed.

Reduced room projection with geometry checked against the usable entry and nearby fixtures.

Repeatable room schedules coordinated with shower bases, finishes, handedness and packing references.

Corner access reviewed around vanities, toilets, controls and daily movement.

Room types aligned through approved drawings, component references and inspection scope.

Finished openings, uneven walls and existing shower base conditions documented before approval.

Footprint, door action and finish options presented for buyer selection and specification.

Product definition
A quadrant shower enclosure fits into a bathroom corner and uses a curved or faceted front between two wall profiles. Its compact footprint can preserve circulation space.
An offset quadrant extends farther along one wall. That asymmetry makes wall identification, handing and shower base orientation essential.
The name alone does not define the radius. Confirm geometry against the matching shower base, technical drawing and finished site dimensions.

Decision guide
Compare footprint, entry and installation coordination against the actual bathroom plan.
| Option | Footprint and entry | Wall and shower base needs | Project fit |
|---|---|---|---|
| Quadrant | Compact curved or faceted front; entry depends on door arrangement | Two wall lengths plus confirmed radius or shower base | Compact corners with approved geometry |
| Offset quadrant | Longer on one side; handing affects entry | Unequal walls and oriented shower base drawing | Asymmetrical corner plans |
| Square corner | Defined square footprint with straight fronts | Two equal or approved wall dimensions | Rooms accepting greater front projection |
| Rectangular corner | Longer straight footprint and varied entry options | Both walls, shower base and door position confirmed | Wider shower zones |
| Walk-in shower | Open entry with fixed screen | Floor fall, splash zone and panel support | Plans with sufficient open access depth |
RFQ checklist
Copy these points into the quotation request and identify who approves the final drawing.


Factory-backed coordination
WNS Global supports factory-backed sourcing communication from Foshan, China.
Send corner measurements, shower base drawings, room plans, quantities, finish references and technical requirements. We coordinate drawing approval, packing and inspection questions.
Project-specific dimensions, materials, compliance, lead time and commercial terms remain subject to written confirmation.
About WNS Global
Buyer questions
Project-specific answers remain subject to approved drawing and project confirmation.
A quadrant enclosure fits a bathroom corner and uses a curved or faceted front to reduce its room footprint. Confirm the final geometry on the approved drawing.
An offset quadrant extends farther along one wall than the other. Left and right wall dimensions, handing, entry and shower base reference must be identified.
Provide the shower base drawing or an agreed radius reference together with both finished wall lengths. Do not identify the curve from a photograph alone.
No. Shower base geometry, radius, rim width, threshold, level and mounting position must match the approved enclosure drawing and local installation plan.
Sliding doors avoid outward swing, but usable entry, panel overlap, roller access and cleaning space still require review against the room plan.
Adjustment depends on the selected profile system. Record out-of-square conditions and multiple finished measurements for technical review before approval.
State wall substrate, finished tile, fixing zones, vertical variation, nearby services and any obstruction affecting profiles, hinges or installation access.
Yes, subject to technical and commercial confirmation. Send room schedules, shower base drawings, quantities, target market, finish direction, branding and packaging requirements.
Learn before you buy
Draw the empty space first. The clearances are what fill the room.
The space outside the shower decides more than preference does.
Toughened glass has no adjustment. Measure after tiling.
One forgives walls that are out of square. The other does not.
Two deposits, two chemistries, and one habit that beats both.

Project inquiry Sanitary ware wholesale orders and single project schedules are handled by the same team.
Send both finished wall dimensions, shower base or radius drawing, door operation, quantity, destination and target-market requirements.