Which Configuration Fits?
Choose freestanding, built-in, custom-shape or custom-color direction according to the approved drawing, installation conditions, drainage and project intent.

Factory-backed sourcing · Foshan, China
Drawing-led bathtubs planned around shape, installation, drainage, finish references and project approval.
Custom Solid Surface Bathtubs are drawing-led bathing units developed when a project needs a specific shape, installation relationship or finish direction. WNS Global supports importers, distributors, developers, hospitality procurement teams, contractors, showroom buyers and project specifiers with sourcing around approved overall and internal dimensions, shape, installation interface, rim or deck detail, drain and overflow placement, faucet location, surface and color reference, service access, packaging direction and project documents. Final values remain subject to approved specification. This line is produced at our own base in Foshan, so a buyer deals with the sanitary ware manufacturer directly rather than through an intermediary.
Configuration range
Select the custom route first, then confirm the approved drawing, shape, installation interface, drainage, finish reference and project responsibilities.

A drawing-led feature bathtub with site, drainage and clearance review.
Explore bathtub categories →
A project-specific tub coordinated with deck, access and finish details.
Explore bathtub categories →
A shape-led option evaluated for technical and commercial feasibility.
Explore bathtub categories →
A sample-led color or finish direction subject to approved reference.
Explore bathtub categories →Specification control
Final values should be controlled by a project drawing, approved sample, technical sheet or confirmed model. Where a value is not agreed, record it as “Available / confirm per model.”
What buyers should confirm: approved overall and internal dimensions, shape, installation interface, rim or deck detail, drain and overflow placement, faucet location, surface and color reference, service access, packaging direction and documents to confirm.

| Approved overall and internal dimensions | Available / confirm per model | Shape and installation interface | Confirm against approved drawing |
|---|---|---|---|
| Drain and overflow placement | Confirm per selected model | Rim or deck detail | Confirm with project team |
| Faucet location and service access | Confirm with fitting and rough-in plan | Packaging direction | Confirm responsibility and site condition |
| Surface and color reference | Confirm with finish schedule | Project document control | Confirm where approved |
| Project documents to confirm | Drawing, approved sample where required, technical sheet, component schedule, quotation and packing needs | ||

Buyer decisions
Review the approved drawing, installation support, drainage, access and finish reference, not only the visible tub shape.
Choose freestanding, built-in, custom-shape or custom-color direction according to the approved drawing, installation conditions, drainage and project intent.
Provide approved drawings, finished dimensions, installation support, rim or deck detail, drain and overflow placement, faucet plan, handling route and installation responsibility.
Confirm the shape, surface or color sample, installation interface, drain and overflow, faucet reference, service access and supplied component scope.
Show approved dimensions, shape, rim or deck detail, installation interface, drain, overflow, faucet location, service access and responsible approver.
The buyer or project team should verify destination-market requirements for structure, water connection, drainage, electrical work where used and installation.
Risk control
WNS Global can support requirements review, configuration confirmation, drawing or sample review where applicable, packing and documentation alignment, and issue escalation. The buyer’s project team remains responsible for floor or installation route, structural support, services, lifting access and local installation suitability.

| Risk to control | Pre-order sourcing response |
|---|---|
| Drawing completeness | Review the approved drawing, revision status and all required installation interfaces before order confirmation. |
| Installation support | Confirm responsible support, handling, installation and local site conditions. |
| Drain and overflow placement | Review their location against the selected model and approved drawing. |
| Rim or deck detail | Record service access, handling route and protected edges before order approval. |
| Approved finish sample | Confirm the selected fitting interface and location with the responsible trade. |
| Change control after approval | Record approved revisions and control changes through the agreed document process. |

Private-label and projects
WNS Global can review approved shape, size, color or finish direction, installation detail, drain or overflow location, marking or packaging discussion and project drawings. Availability depends on technical and commercial feasibility, an approved reference and order confirmation.
Approved drawings, shape, installation detail, finish reference, drain and overflow, packaging direction, quantity, target market and packing request.
Configuration fit, reference clarity, available product route and order-document alignment.
Project sequence
Use a controlled record to connect the selected custom bathtub with approved drawings, samples, installation detail, finishes and agreed order scope.

Share approved drawings, dimensions, shape, installation detail, surface reference, site data, quantity and project needs.
Review dimensions, shape, installation detail, drain, overflow, faucet location, service access and finished surfaces.
Approve the applicable drawing, technical sheet, sample, finish reference or component schedule.
Confirm approved order details, packing and the agreed inspection scope.
Align labels, packing list, agreed documents and shipment coordination.
Order-specific inspection
Inspection scope and acceptance criteria are agreed for the order. The final review compares the selected product with the approved specification, finish reference and packing requirement.
Any special test, certificate or local standard remains subject to the selected product and destination-project requirement.

Project fit
Choose the application only after the room plan, floor or installation route, services and local installation responsibility are defined.

Develop a signature bath around a controlled room-type specification.
Discuss hospitality requirements →
Coordinate a distinctive bathing form with architecture and fittings.
Discuss villa requirements →
Review use, access and service details before approving a feature tub.
Discuss showroom requirements →
Create approved display concepts with traceable sample references.
Discuss showroom requirements →
Product definition
Custom Solid Surface Bathtubs are project-led bathing units developed from an approved drawing, sample or confirmed product reference when standard configurations do not define the required shape, installation detail or finish direction. They may be freestanding, built-in, shape-led or color-led, but each route needs coordination with dimensions, rim or deck interface, drainage, overflow, faucet location, service access, handling, surface reference, packaging and local installation responsibility.
A styled image does not define complete supply. Do not assume the bathtub includes decking, flooring, fittings, plumbing components, access provision, installation or other visible accessories unless the approved quotation identifies that scope.
Not the same as

Decision guide
Compare the custom route with drawing control, installation detail, finish reference and project conditions.
| Approach | Installation or integration | Typical project fit | Buyer confirmation point |
|---|---|---|---|
| Custom freestanding tub | Drawing-led feature with confirmed site, drainage and clearance planning. | Hospitality suites, villas and feature bathrooms. | Dimensions, floor support, drain, fittings and lifting route. |
| Custom built-in tub | Coordinated with deck, access and finish details on an approved drawing. | Spa projects and architectural bathroom zones. | Opening, rim or deck detail, drainage, access and finish sample. |
| Custom shape or color tub | Shape-led or sample-led route reviewed for technical and commercial feasibility. | Showroom collections and controlled feature concepts. | Approved drawing, sample, revision control and component scope. |
RFQ checklist
Attach these points to the enquiry before quotation or purchase-order approval.


Factory-backed coordination As a Foshan sanitary ware supplier we can also bring in the fittings that sit around it, so one contact covers the whole bathroom.
WNS Global is a factory-backed bathroom supplier and export team from Foshan, China. For custom solid surface bathtub projects, the role is to coordinate a clear buying brief, selected product direction, export communication and project-document alignment against the approved reference.
Share drawings, installation route, service locations, finish reference, quantity and target market.
Review tub route, rim, drainage, access, fitting interface and component scope.
Keep product, packing, labels, documents and approval ownership aligned.
Coordinate agreed inspection, packing and shipment-document questions.
Exact product availability, materials, finishes, commercial terms and delivery details remain subject to written confirmation for the selected order.
About WNS Global
Buyer questions
Model-dependent points should be confirmed through the selected product reference and approved project documents.
Start with the approved project drawing, overall and internal dimensions, shape, installation interface, rim or deck detail, drainage, faucet location, service access and surface reference. Confirm the configuration through controlled documents.
Share approved drawings, site dimensions, shape, installation detail, drainage, fittings, surface reference, quantity, target market, component scope and required documents.
Do not assume they are included. Confirm the exact supplied component scope and the responsible installation party in the approved quotation.
WNS Global can review approved shape, size, color or finish direction, installation detail, drain or overflow location, marking or packaging discussion subject to feasibility, an approved reference and order confirmation.
Inspection follows the agreed order scope, including dimensions, surface, drainage locations, components, labels, packing and the approved technical reference.
The buyer or responsible project team should verify destination-project requirements for structure, plumbing, drainage, electrical work where used and installation.
Learn before you buy
From blended mineral and resin to a cast, cured and hand-finished bath.
Why the same bath is routine in one country and blocked in another.
Protecting fragile baths in transit, packing to cut freight, and what to ask a supplier.
Matching rooms, locking specs, lead time, per-room labeling, and delivery at scale.
Depth means three things. Length means two. Here is which.
Weight and repairability separate them far more than heat does.

Project enquiry Sanitary ware wholesale orders and single project schedules are handled by the same team.
Use Your Request to share your quantity estimate, drawing, reference photo, required finish, target market or required date where relevant. WhatsApp is the faster contact route for a first discussion.