The Briefing Pack

Start with the dimensioned drawings approved before production, with fixing positions, service positions and the tolerances stated on them, at the revision the factory built to; withdraw any earlier one. Add the installation sequence per product line: what is fixed first, what is checked before the next step, where level and plumb are taken from. Add the hardware adjustment procedures for cabinet hinges and slides and for enclosure rollers and hinges; an installer who knows the adjustment range uses it instead of packing or forcing.
Then the sealant and adhesive types as specified by the supplier for each material, and the ones to avoid. Add the care instructions to leave with the operator. Add the golden sample or its photographs with the finish reference, so that correct is a comparison, not an opinion. Finish with the defect reporting route: who the installer tells, in what form and with what photographs, when a unit does not match or arrives damaged.
- Approved drawings at the current revision, with fixing positions and tolerances
- Installation sequence and hardware adjustment procedures per product line
- Sealants and adhesives as specified by the supplier
- Care sheet, golden sample photographs and the defect reporting route
What Is Fixed at the Factory

The most useful page in the pack says what cannot be changed on site. A solid surface bathtub's drain and overflow are cast into the mould; the waste connection has to meet them. Cut-outs in a top are made to the approved drawing; a faucet chosen after the top was cut will not fit unless the cut-out was made for it. Enclosure glass is cut and drilled to the drawing; a hinge or a handle cannot be moved, and an opening out of tolerance is corrected in the wall or within the profile adjustment, not by re-drilling.
Against that list, the pack states what is adjustable and by how much: hinges, slides and rollers, the enclosure profiles, the leveling on floor-standing units, and the tolerance the finished wall and floor were supposed to meet. An installer with both lists can tell at the first unit whether the room is within what the product can absorb or the site has to be corrected first.
- Fixed: drain and overflow positions, top cut-outs, pre-drilled glass, height and handing
- Adjustable: hinges, slides, rollers, enclosure profiles, leveling, within stated ranges
- Out-of-tolerance walls and floors are corrected on site, not by modifying the product
- Both lists on one page, per product line
The Pre-Start Meeting
A pre-start meeting is short, one per room type, and it saves the rework of the first rooms. Hold it with the first unit of each product line unpacked in a representative room, with the installer's lead, the site manager and someone who knows the drawings. Walk the pack: drawing against wall, fixing positions against services, sequence, fixed points, sealant, adjustment range and reporting route. Install the first unit together and treat it as the site's reference for the rest.
The meeting also surfaces the site's conditions before they become the product's problem: a wall out of plumb, a waste that is not where the drawing shows it, a floor that is not level. Each is cheaper to fix before installation, and the meeting is where the installer and the site manager agree who fixes what. Record the decisions on one page and add it to the pack for the next crew.
- Per room type, first unit unpacked, drawings in hand
- Walk the pack and install the first unit together as the site reference
- Surface out-of-tolerance walls, services and floors before the crew starts
- Record the decisions and add them to the pack